Skip to content

Renovation Budget Calculator

Enter the area, the build cost per square metre, permits, fixtures, and a contingency. The calculator adds the work, fees, and fittings, then holds back a reserve for surprises. The default 60 m² renovation at $1,200.00/m² comes to $91,425.00, or $1,523.75/m² all-in.

Updated 2026-11-19 Editorial estimate Calccc Editorial Team Free · No sign-up
m²
$/m²

Labour and materials for the scope you have in mind, before fees and fixtures.

$
$

Kitchen, bathroom, lighting, and other items chosen separately from the build contract.

%

A reserve for surprises. Renovations rarely finish at the quoted price.

Advanced options
%
Scenarios A/BSave two input sets and compare the results. Stored only in this browser.
AEmpty
BEmpty

Your inputs stay in this browser. No account, no uploads.

Professional worksheet

Detailed schedule & assumptions

Inputs used, method, sensitivity, and any year-by-year table. The summary above stays compact; the audit lives here.

Professional worksheet

Inputs, scope, and sensitivity

Inputs used

Advanced inputs used

Method and scope

Result audit

MetricValue

Sensitivity check

CaseInputResult

A one-variable sensitivity check, holding every other input constant. It is not a forecast.

What this calculator does

Most renovation budgets fail in the same way: the build cost is estimated, the fixtures are chosen later, and the contingency is treated as optional. The result is a number that looks affordable until the first variation, the permit fee, or the appliance package arrives. This calculator starts from the two figures that drive the build, floor area and cost per square metre, and then adds the items that sit outside a building contract: permits and professional fees, fixtures and appliances, and a contingency reserve. It also splits the build cost into labour and materials so you can see where the money goes and how a change in specification moves the total. The all-in cost per square metre is the number to compare with other quotes, because it includes the items that are easy to leave out when comparing headline build rates. The estimate is only as good as the cost per square metre, which varies by region, scope, and finish level.

How to use it

  1. Enter the floor area being renovated, not the whole house unless the whole house is in scope.
  2. Use a build cost per square metre that matches the scope and finish level, not the cheapest quote.
  3. Adjust the labour share if your project is unusually labour-heavy or you are supplying labour.
  4. Add permits, inspections, and professional fees separately from the build contract.
  5. Add the fixtures and appliances you expect to buy, including delivery and installation.
  6. Set a contingency of at least 10–20%, then compare the all-in cost per square metre with other quotes.

How it works

Build cost = area × cost per m². Subtotal = build cost + permits + fixtures. Contingency = subtotal × contingency %. Total budget = subtotal + contingency. The all-in cost per m² = total ÷ area. In the default case, $72,000.00 of work plus $1,500.00 of fees and $6,000.00 of fixtures gives a $79,500.00 subtotal; a 15% reserve adds $11,925.00 for a $91,425.00 total.

Example calculations

Example 1: A 60 m² whole-flat renovation

At $1,200.00/m² the build is $72,000.00, split into $28,800.00 of labour and $43,200.00 of materials. Permits add $1,500.00, fixtures $6,000.00, and the 15% contingency $11,925.00, for a total of $91,425.00 or $1,523.75/m².

Example 2: A small bathroom at a high specification

A 35 m² project at $2,200.00/m² has a build cost of $77,000.00. With $9,000.00 of fixtures, $800.00 of fees, and a 20% contingency, the total is $104,160.00, or $2,976.00/m². Small rooms often cost more per square metre because the fixed costs are spread over less area.

Example 3: A larger house at a lower rate

A 120 m² renovation at $900.00/m² comes to $108,000.00, plus $3,000.00 of fees and $15,000.00 of fixtures. A 10% contingency gives $138,600.00, or $1,155.00/m². The lower rate reflects a lighter scope, not a better deal; compare specifications before comparing totals.

What the result means

The all-in cost per square metre is the fairest comparison between quotes because it includes fees and fittings that a builder's rate may exclude. In the default case, the build itself is $72,000.00 but the project consumes $91,425.00; the difference is the part homeowners forget. The contingency is not a slush fund. It covers unknown conditions behind walls, price changes between quote and order, and small additions that are cheaper to approve than to argue about. If the project finishes without using it, the reserve stays in the bank. The labour share is a useful sanity check: a labour-heavy quote with a low materials figure may be hiding poor-quality fittings, while a very low labour share may mean you are supplying a lot of the work yourself.

Common mistakes

  • Comparing builder quotes on the build rate alone and ignoring permits, fixtures, and contingency.
  • Setting the contingency at zero because the quote is supposed to be fixed.
  • Using a showroom finish level with a builder-basic cost per square metre.
  • Forgetting delivery, installation, and disposal costs for fixtures and appliances.
  • Budgeting for the renovation but not for rent, storage, or lost income during the work.
  • Approving variations without checking the effect on the all-in cost per square metre.

Assumptions and limits

  • The cost per square metre covers the full scope of the work, including labour and materials.
  • The area entered is the floor area being renovated, not the land area.
  • Permits and professional fees are separate from the build contract.
  • Fixtures and appliances are bought in addition to the build cost.
  • The contingency percentage is applied to the subtotal, not only to the build cost.
  • Financing costs, temporary accommodation, and the value of your own labour are excluded.

Frequently asked questions

What contingency should I use for a renovation?

Ten to twenty percent is a common range. Use the higher end for older buildings, structural work, or a project where the scope is still being defined. The reserve is there to absorb unknowns, not to upgrade the finishes.

Does the cost per square metre include fixtures?

Usually not. Builder rates typically cover labour and materials for the build, while taps, tiles, appliances, and lighting are chosen separately. This calculator keeps them separate so the total is visible.

Why is the cost per square metre higher for a small room?

Fixed costs such as design, permits, site setup, and trades' minimum call-out charges are spread over fewer square metres. A small bathroom can cost more per square metre than a large open-plan living area even though the total is lower.

Should I include rent while the work is done?

Yes, if you cannot live in the property. Temporary accommodation, storage, and moving costs are real project costs but sit outside the build budget. Add them to the total before deciding whether the project is affordable.

How do I compare two quotes with different specifications?

Compare the all-in cost per square metre, the inclusions list, the fixture allowances, and the contingency. A lower quote with a basic specification is not cheaper than a higher quote with the finishes you actually want; normalize the specification first.

Is the estimate suitable for a loan application?

It can be a starting point, but lenders usually want a fixed quote or a quantity surveyor's estimate. Use this calculator to sanity-check the budget, then get a documented quote for the loan application.

Sources

This is an educational budget estimate, not a construction quote or financial advice. Renovation costs vary by location, scope, and specification. Obtain itemized quotes and confirm permit requirements with local authorities before committing to a project.

2026 update

How to use the professional output

This page is not just a formula box. The result is designed to be checked, compared, and taken away.

  • Professional worksheet. The result includes the inputs used, the method and scope, and a one-variable sensitivity check for finance calculators.
  • A/B scenarios. Save two input sets in the browser and compare the primary, secondary, and breakdown figures side by side.
  • Print / PDF and CSV. Print a branded worksheet, or export the year-by-year table when the calculator produces one.
  • Quote differences. The section below explains why a bank, lender, broker, or provider can quote a different number.

The formulas and assumptions above still govern the number. The worksheet makes the estimate auditable; it does not make it a lender quote, tax return, or personalized advice.

Before you use a quote

Why your bank, lender, or provider’s number may differ

This calculator gives you a transparent estimate. A bank, lender, broker, fund provider, or tax authority can quote a different number because its inputs, fees, underwriting, and timing are different.

What changes the quote

  • Fees. Providers may charge fees that are not part of the headline rate.
  • Eligibility. Credit, income, collateral, and provider rules change the offered terms.
  • Taxes and insurance. These are often quoted separately and may not be included.
  • Timing. Rates, prices, and eligibility rules can change after the quote.

How to compare offers

  1. Compare the APR and total cost, not only the monthly payment.
  2. Ask for a written quote or Loan Estimate with all fees itemized.
  3. Use the same loan amount, term, date, and assumptions for every offer.
  4. Check what is excluded: taxes, insurance, closing costs, maintenance, or provider fees.
  5. Keep an emergency reserve; the lowest payment is not always the safest choice.

Reference: CFPB Loan Estimate explainer.

Calccc Editorial Team · Updated 2026-11-19

Prepared by Calccc Editorial Team as an educational estimate. This page is not a licensed professional review and is not financial, medical, legal, or tax advice.

Editorial estimate prepared by the Calccc Editorial Team; not a licensed professional review.