Excavation Calculator

Enter the excavation length, width, and depth. The calculator gives the bank volume in place, the larger loose volume after digging, the number of truckloads, and the approximate spoil weight. Swell and density are adjustable because soil type and moisture change both numbers.

Updated 2026-11-18 Editorial estimate Calccc Editorial Team Free · No sign-up
m
m
m
%

Loose volume is larger than bank volume. 20–30% is common for mixed soil.

Advanced options
t/m³
m³

Loose volume per load; confirm with the hauler.

Scenarios A/BSave two input sets and compare the results. Stored only in this browser.
AEmpty
BEmpty

Your inputs stay in this browser. No account, no uploads.

Professional worksheet

Detailed schedule & assumptions

Inputs used, method, sensitivity, and any year-by-year table. The summary above stays compact; the audit lives here.

Professional worksheet

Inputs, scope, and sensitivity

Inputs used

Advanced inputs used

Method and scope

Result audit

MetricValue

What this calculator does

Excavation quantities are not the same as the hole. Soil in the ground is compacted by age and overburden; when dug, it loosens and takes up more space. That increase is called swell, and it is why a 50 m³ hole can produce 62.5 m³ of spoil and more truckloads than the hole suggests. This calculator computes the bank volume, applies a swell percentage to get the loose volume, divides by the truck capacity, and estimates the weight using a bank density. It is a planning estimate for spoil hauling and truck counts, not a geotechnical analysis. Soil type, moisture, rock, and the contractor's handling can change the numbers substantially.

How to use it

  1. Enter the length, width, and depth of the excavation in metres.
  2. Set a swell percentage for the soil; 20–30% is common for mixed soil.
  3. Adjust the bank density if you know the local soil.
  4. Enter the loose volume a truck can carry, not the nominal bed size.
  5. Read the bank volume, loose volume, truckloads, and spoil weight.

How it works

Bank volume = length × width × depth. Loose volume = bank volume × (1 + swell ÷ 100). Truckloads = ceiling(loose volume ÷ truck capacity). Spoil weight = bank volume × bank density. In the default case, a 10 × 5 × 1 m excavation is 50.00 m³ in place, 62.50 m³ loose, about 8 truckloads at 8.0 m³ per load, and 90.0 t of spoil.

Example calculations

Example 1: 10 × 5 × 1 m, 25% swell, 8 m³ trucks

The bank volume is 50.00 m³. With 25% swell the loose volume is 62.50 m³, which needs 8 truckloads of 8.0 m³. At 1.8 t/m³ the spoil weighs 90.0 t.

Example 2: 20 × 10 × 1.5 m, 30% swell

The bank volume is 300.00 m³ and the loose volume is 390.00 m³. At 8 m³ per load that is 49 loads and 540.0 t. A larger swell or a smaller truck can add several loads, so confirm the hauler's capacity.

Example 3: 3 × 3 × 0.6 m, 20% swell, 6 m³ trucks

A small footing excavation is 5.40 m³ in place and 6.48 m³ loose. With 6 m³ trucks, that is 2 loads. Small jobs still need a plan for the spoil; stacking it next to the trench can be a safety hazard.

What the result means

Swell is the ratio of loose volume to bank volume. It varies with soil: sand and gravel may swell about 10–20%, while clay and rock can swell more, and some soils compact back down when re-used. The density figure is for estimating weight, not for a load limit; a truck's legal payload can be reached before its bed is full, especially with wet, heavy soil. The calculator does not include over-excavation, working space, slope, or dewatering. For a real project, add the contractor's required working room and confirm the hauling capacity and disposal site. OSHA also requires protective systems for trenches 5 feet or deeper and a utility locate before digging.

Common mistakes

  • Ordering trucks based on bank volume and forgetting swell.
  • Using the truck's nominal bed size instead of its legal or practical capacity.
  • Ignoring over-excavation, working space, and slope.
  • Stacking spoil against the trench wall, which adds load and can cause a collapse.
  • Digging without calling the utility locate service.

Assumptions and limits

  • The excavation is a rectangular box with vertical sides.
  • Swell is uniform for the whole volume.
  • Bank density is representative of the soil and moisture.
  • Truck capacity is the loose volume per load.
  • No dewatering, shoring, or disposal-site restrictions are modeled.

Frequently asked questions

What is soil swell?

Swell is the increase in volume when soil is excavated and loosened. A 25% swell means 1 m³ in place becomes 1.25 m³ loose. It depends on soil type, moisture, and handling.

How many truckloads will my excavation need?

Divide the loose volume by the loose volume the truck can carry, then round up. A 50 m³ hole with 25% swell produces 62.5 m³ loose, which is 8 loads at 8 m³ per load.

How much does a cubic metre of soil weigh?

A typical bank density is about 1.6–2.0 t/m³, with 1.8 t/m³ a common planning value. Wet clay, rock, and gravel can be heavier. Use a local figure for hauling and load limits.

Can I reuse the excavated soil?

Sometimes, for backfill or grading, but it will not compact to the same volume without proper moisture and compaction. Reusing soil can reduce disposal but may not be suitable under a slab or foundation.

Does the calculator include the working space around a foundation?

No. Contractors need room to work, and codes may require sloping or shoring. Add the working space and any over-excavation to the dimensions before ordering.

What safety rules apply?

In the United States, OSHA requires protective systems for trenches 5 feet or deeper and a competent person to inspect them. Call 811 before digging to locate utilities. Never enter an unprotected trench.

Sources

This calculator is an educational volume estimate, not a geotechnical or safety plan. Soil swell, density, and truck capacity vary. Excavation is hazardous; follow OSHA requirements, call 811 before digging, and use a competent person for protective systems.

2026 update

How to use the professional output

This page is not just a formula box. The result is designed to be checked, compared, and taken away.

  • Professional worksheet. The result includes the inputs used, the method and scope, and a one-variable sensitivity check for finance calculators.
  • A/B scenarios. Save two input sets in the browser and compare the primary, secondary, and breakdown figures side by side.
  • Print / PDF and CSV. Print a branded worksheet, or export the year-by-year table when the calculator produces one.

The formulas and assumptions above still govern the number. The worksheet makes the estimate auditable; it does not make it a lender quote, tax return, or personalized advice.

Calccc Editorial Team · Updated 2026-11-18

Prepared by Calccc Editorial Team as an educational estimate. This page is not a licensed professional review and is not financial, medical, legal, or tax advice.

Editorial estimate prepared by the Calccc Editorial Team; not a licensed professional review.