What this calculator does
Expected value is the probability-weighted average of all possible outcomes. It is the number to use when a decision is repeated many times: a bet with a positive expected value is profitable on average, even if any single trial can lose. Variance and standard deviation describe how widely the outcomes spread around that average, which matters because two options can have the same expected value and very different risk. This calculator accepts up to eight outcomes, normalises the probabilities if they do not sum to exactly one, and reports all three measures. It is a general probability tool, not a prediction for a single event.
How to use it
- Enter the outcome values as a comma-separated list.
- Enter the matching probabilities in the same order.
- Use decimals (0.2) or percentages (20) consistently.
- Check the probability sum and let the calculator normalise if needed.
- Read the expected value together with the standard deviation.
How it works
Example calculations
Example 1: Outcomes of 10, 20, and 50
With probabilities of 0.2, 0.5, and 0.3, the expected value is 27.00. The variance is 241.00 and the standard deviation is 15.52, so a single trial can land well away from the average.
Example 2: A certain outcome of 5
When both outcomes are 5, the expected value is 5.00 and the standard deviation is 0.00. The probabilities add up to 100, and the calculator normalises them to 1 before averaging.
Example 3: A 70% chance of 100 and a 30% chance of -50
The expected value is 55.00 per trial, but the standard deviation is 68.74. A positive expected value does not prevent a losing run, which is why the spread matters as much as the mean.
What the result means
Expected value is a long-run average, not a forecast of the next outcome. A positive expected value means the decision is favourable if it is repeated enough times and the probabilities are accurate. The standard deviation measures the typical distance from the average; a high value means more uncertainty and a wider range of plausible results. Variance is in squared units, which makes it harder to interpret directly, so the standard deviation is usually the more useful number. The calculation assumes the outcomes are exhaustive and mutually exclusive, and that the probabilities are correct. In real decisions, the probabilities are often estimates, so test the result with a range of assumptions.
Common mistakes
- Adding probabilities in percentages and outcomes in dollars without converting.
- Leaving out an outcome, so the probabilities do not cover the full set.
- Treating the expected value as the most likely outcome.
- Ignoring the spread when comparing two options.
- Using probabilities that do not sum to 100% and misreading the result.
Assumptions and limits
- The outcomes are mutually exclusive and exhaustive.
- Each probability applies to its paired outcome.
- Probabilities are non-negative and the total is above zero.
- The expected value is interpreted as a long-run average.
- The inputs are estimates, not known population parameters.
Frequently asked questions
What does expected value mean in plain language?
It is the average result you would get per trial if you repeated the same decision many times. It does not tell you what will happen once; it tells you what tends to happen over many repetitions.
What if my probabilities do not add up to 1?
The calculator divides each probability by the total, so the weights still sum to 1. The output is the same as if you had entered a complete and correctly normalised distribution, but check the probability sum to catch missing outcomes.
Why is variance in squared units?
Variance is the average of squared deviations, so its units are the outcome units squared. It is useful for calculation, but the standard deviation is easier to interpret because it is in the original units.
Can the expected value be an impossible outcome?
Yes. The expected value of a die roll is 3.5, which no single roll can produce. It is an average, not a prediction of one trial.
How many outcomes can I enter?
Up to eight, with one probability per outcome. If you have more, group similar outcomes or use a spreadsheet with the same formula.
Does a positive expected value guarantee a profit?
No. It means the decision is favourable on average over many repetitions. A single trial, or a small number of trials, can still lose, and the standard deviation shows how much variation to expect.
Sources
2026 update
How to use the professional output
This page is not just a formula box. The result is designed to be checked, compared, and taken away.
- Professional worksheet. The result includes the inputs used, the method and scope, and a one-variable sensitivity check for finance calculators.
- A/B scenarios. Save two input sets in the browser and compare the primary, secondary, and breakdown figures side by side.
- Print / PDF and CSV. Print a branded worksheet, or export the year-by-year table when the calculator produces one.
The formulas and assumptions above still govern the number. The worksheet makes the estimate auditable; it does not make it a lender quote, tax return, or personalized advice.